Analysis of Power and Voltage Losses in Electric Submersible Pump Motor Installations
Abstract viewed: 205 times
pdf downloaded: 122 times
Abstract
In area mining are quite extreme, where the level of safety from high temperatures and toxic gases which are explosive as well as well flow pressure is also high and can damage production equipment. Therefore, it is very necessary to install reliable electrical power, starting from analyzing the selection of cable types that used, voltage drop, power losses and transformer selection. The problems mentioned previously, this research carried out an analysis of improvements to voltage drops and power losses that occurred in the ESP motor installation system. The method used is to replace the type of cable used in three scenarios with three different types of cable. The installation system data obtained from this company was then processed using software which was then validated with theoretical calculation results. The result of voltage drops and power losses in ESP cables according to standards using scenario 3, replacing AWG 2/0 type with a voltage rating of 5 kV, diameter of 11.709 mm and has a KHA of up to 210 A. The voltage drop value after repairs are carried out based on theoretical calculation results has an average percentage index value of 4.5% and power losses of 4.6%. This shows that in the condition after repairs, both the results of simulation calculations and theoretical values have met the IEEE std 141-1993 standard which states that the value of voltage drop and power losses in industrial plan distribution systems must be below 5%.
References
M. Barnes, Practical Variable Speed Drives and Power Electronics. 2003.
M. Amao, “Electrical Submersible Pumping (ESP) Systems By Components and Operating Mechanism,” 2014.
P. Petrowiki, “Electrical Submersible Pumps.” SPE International, 2018.
D. G. Sanubari, “Evaluasi Electric Submersible Pump (ESP) pada Sumur L5A-X2 dan L5A-X3,” 2017.
A.--I. S. ANSI--IEEE Std, IEEE Recommended Practice for Installation , Termination , and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications, 576th–2000th ed., 2003.
L. B. Megantara, K. Karnoto, and T. Sukmadi, “Perancangan Instalasi Listrik Sistem Pemilihan Kabel Dan Pemutus Pada Rumah Pompa Bandara Ahmad Yani Semarang Menggunakan Software Etap 12.6,” Transient, vol. 7, no. 4, p. 989, 2019.
G. Takacs, Electrical Submersible Pumps Manual (Design, Operations and Maintenance), 2nd ed. United Kingdom: Gulf Professional Publishing imprint Elsevier, 2018.
I. S. 141-1993, IEEE Recommended Practice for Electric Power Distribution for Industrial Plants, vol. 2, no. 2. 1988.
C. H. B. Apribowo, G. Faradiba, F. Adriyanto, and O. Listiyanto, “Study Analysis of Voltage Drop in a Typical Office Building Lighting System: A Case Study of of FEM IPB Building Electrical Installation,” J. Electr. Electron. Information, Commun. Technol., vol. 1, no. 1, p. 26, 2019.
I. P. Arya Suardika, I. G. Dyana Arjana, and A. A. G. Maharta Pemayun, “Rekonfigurasi Saluran Distribusi 20 kV Untuk Mengurangi Rugi-Rugi Daya dan Jatuh Tegangan Pada Penyulang Abang,” J. SPEKTRUM, vol. 5, no. 2, p. 231, 2018.
P. Imbang Tata Alam, “Data Teknis Instalasi Motor ESP Sumur Minyak AC 05 PT Imbang Tata Alam.” 2023.
R. A. Saputra, "Analisa Pengaruh Parameter Design Pompa pada Perencanaan ESP Untuk Sumur Minyak Menggunakan Nomograph Usulan dalam Menentukan Persentase Gas dan Volume Fluida yang Masuk Pompa," Repository Universitas Islam Riau, 1-31, 2017.
H. Sucipto, S. S. Wiwaha, I. Ridzki, "Instalasi ESP (Electric Submersible Pump) Sistem Tandem pada Sumur Minyak dengan Variable Speed Drive," Jurnal Eltek, 16(1), 51, 2018.
Hermanto, D. Y. Sukma, Feranita, "Perbaikan Jatuh Tegangan pada Feeder Jaringan Distribusi Tegangan Menengah 20 kV Teluk Kuantan," Jom FTEKNIK, IV(1), 1-8, 2017.
Fuziah, Naila, "Pengoprasian Electric Submersible Pump (ESP) di Lapangan Kawengan PT GCI REGION Jawa Field CEPU," STEM Akamigas, 2015.
Erhaneli and Ramadonal, "Optimasi Pemasangan Kapasitor dalam Perbaikan Faktor Daya dan Drop Tegangan pada Sistem Distribusi 20 kV," Jurusan Teknik Elektro ITP, IV(1), 75-79, 2015.
B. Aditya Prayoga and M. N. Edison, "Transformers (Issue 0806365412)," Fakultas Teknik Universitas Indonesia, 2010.
S.H. Kholifah Yusuf Mubarok, "Analisis Penanganan Jatuh Tegangan pada Jaringan Distribusi 20 kV Menggunakan Electrical Transient Analysis Program (ETAP) 12.6.1, 22, 2022.
K. H. William, Distribution System Modeling and Analysis. 2001.
Copyright (c) 2024 Khusnul Habib Siregar Habib, Azriyenni Azhari zakri
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.