Abstract

Maintaining 70 kV, 150 kV, and 500 kV telecommunications equipment at substations in the Java, Madura, and Bali interconnection system is vital to ensure asset reliability and performance. Accidents have caused delays and human resource, power supply issues. Implementing a risk management strategy could be considered as the effort to minimize the work accidents. Thus, this study aimed to conducting a systematic analysis and control by integrating the identification process for the effective policies. We used questionnaires to collect precise regional data and then the Hazard Identification, Risk Analysis and Risk Control (HIRARC) and Failure Mode and Effects Analysis (FMEA) methods were used to identify risks and formulate control recommendations. The HIRARC method indicated medium risk levels at 60% and low levels through Risk Priority Number (RPN) assessment, indicating routine monitoring and control is sufficient. The maintenance policies are derived from three approaches: education/training, supervision, and personal protective equipment (PPE). The study found that the Asset Management Contract (AMC) work accidents are due to deficiencies in PPE, technical training, and Occupational Health and Safety (OHS) supervision, which directly impact sustainability.

References

D. A. Hillson, “Towards a risk maturity model,” Int. J. Proj. Bus. Risk Manag., vol. 1, no. 1, pp. 35–45, 1997.

K. Buganová, E. Mošková, and J. Šimíčková, “Increasing the resilience of transport enterprises through the implementation of risk management and continuity management,” Transp. Res. Procedia, vol. 55, pp. 1522–1529, 2021, doi: https://doi.org/10.1016/j.trpro.2021.07.141.

Y. Y. Haimes, Risk Modeling, Assessment, and Management, 3rd ed., USA: John Wiley & Sons, 2009.

T. Aven, “A semi-quantitative approach to risk analysis, as an alternative to QRAs,” Reliab. Eng. Syst. Saf., vol. 93, no. 6, pp. 790–797, 2008, doi: https://doi.org/10.1016/j.ress.2007.03.025.

J. Ridley and J. Channing, Safety at Work, 7th ed., USA: Butterworth-Heinemann, 2008.

A. V Gkika, O.-A. I. Lymperi, E. A. Varouchakis, A. Pavlides, E. A. Zacharis, and E. L. Lekkas, “A risk assessment methodology for supporting decision making on the climate proofing of electricity distribution networks,” Energy Reports, vol. 12, pp. 6155–6185, 2024, doi: https://doi.org/10.1016/j.egyr.2024.11.070.

M. N. Iskandar, Qurtubi, and C. Basumerda, “Risk analysis in occupational safety and health (OSH) by using FMEA and FTA method,” in 2021 International Conference on Decision Aid Sciences and Application (DASA), 2021, pp. 496–501. doi: 10.1109/DASA53625.2021.9682232.

D. E. Nordgård, “A framework for risk-informed decision support in electricity distribution companies utilizing input from quantitative risk assessment,” Int. J. Electr. Power Energy Syst., vol. 43, no. 1, pp. 255–261, 2012, doi: https://doi.org/10.1016/j.ijepes.2012.05.018.

B. Suhardi, A. A. V. Estianto, and P. W. Laksono, “Analysis of potential work accidents using hazard identification, risk assessment and risk control (HIRARC) method,” in 2016 2nd International Conference of Industrial, Mechanical, Electrical, and Chemical Engineering (ICIMECE), 2016, pp. 196–200, doi: https://doi.org/10.1109/ICIMECE.2016.7910457.

A. M. Saedi, J. J. Thambirajah, and A. Pariatamby, “A HIRARC model for safety and risk evaluation at a hydroelectric power generation plant,” Saf. Sci., vol. 70, pp. 308–315, 2014, doi: https://doi.org/10.1016/j.ssci.2014.05.013.

C. B. Sijabat and S. Noya, “Application of HIRA and SPAR-H method to control work accident,” J. Tek. Ind., vol. 15, no. 1, pp. 70–79, 2014, doi: https://doi.org/10.22219/JTIUMM.Vol15.No1.70-79

A. Mili, S. Bassetto, A. Siadat, and M. Tollenaere, “Dynamic risk management unveil productivity improvements,” J. Loss Prev. Process Ind., vol. 22, no. 1, pp. 25–34, 2009, doi: https://doi.org/10.1016/j.jlp.2008.07.011

Department of Occupational Safety and Health (DOSH) Malaysia, Guidelines for Hazard Identification, Risk Assessment and Risk Control (HIRARC)., Putrajaya, Malaysia: DOSH, 2008.

Masjuli, A. Taufani, and A. Abu, Sistem Manajemen Keselamatan dan Kesehatan Kerja Berbasis SNI ISO 45001:2018. Jakarta, Indonesia: Badan Standardisasi Nasional (BSN), 2019.

D. E. Nordgård, K. Sand, and I. Wangensteen, “Risk assessment methods applied to electricity distribution system asset management,” in Reliability, Risk, and Safety, Three Volume Set, US: CRC Press, 2008, pp. 463–470.

B. Stacho, J. Veleba, and J. Dudek, “Arc flash risk assessment – Overview of scope and different approaches in the US and in the EU,” in 2019 20th International Scientific Conference on Electric Power Engineering (EPE), 2019, pp. 1–6. doi: 10.1109/EPE.2019.8778008.

Y. Thamrin, D. Pisaniello, C. Guerin, and P. Rothmore, “The emerging workforce of international university student workers: Injury experience in an australian university,” Int. J. Environ. Res. Public Health, vol. 15, no. 3, p. 456, 2018, doi: https://doi.org/10.3390/ijerph15030456

A. R. Nur Qadri Lutfianto, G. A. Y udhistira, M. A. Febrianti, and Qurtubi, “Management analysis on occupational health and safety in the boiler house using method of hazard identification, risk assessment and determining control,” in 2021 Third International Sustainability and Resilience Conference: Climate Change, 2021, pp. 358–361. doi: https://doi.org/10.1109/IEEECONF53624.2021.9668034.

A. Gonçalves, A. Dutra, and C. C. Mussi, “Occupational risks and health and safety management strategies in the port sector: A systematic literature review,” Saf. Sci., vol. 184, p. 106767, 2025, doi: https://doi.org/10.1016/j.ssci.2024.106767.

D. Roberts, “Integrating OHSMS, risk management & electrical safety,” in 2014 IEEE IAS Electrical Safety Workshop, 2014, pp. 1–8. doi: https://doi.org/10.1109/ESW.2014.6766912.

Published
2025-10-31
How to Cite
[1]
A. R. Zuhal and C. Hudaya, “Risk Assessment of Telecommunication Maintenance in High-Voltage Substations Using HIRARC and FMEA”, IJEEPSE, vol. 8, no. 3, pp. 267-277, Oct. 2025.